Select Location

Find an APM Terminal

Terminals
Luanda Namibe
Terminals
Bahrain
Terminals
Cotonou
Terminals
Douala
Inland Services
Cameroon
Terminals
Pointe-Noire
Terminals
Port Said
Terminals
Tema
Inland Services
Ghana
Terminals
Conakry
Terminals
Abidjan San Pedro
Inland Services
Ivory Coast
Terminals
Aqaba
Inland Services
Jordan
Inland Services
Kenya
Terminals
Monrovia
Inland Services
Mali
Terminals
Apapa Onne
Inland Services
Nigeria
Terminals
Salalah
Inland Services
Saudi Arabia
Inland Services
Senegal
Inland Services
South Africa
Inland Services
Tanzania
Inland Services
Tunisia
Inland Services
UAE
Inland Services
Uganda
Inland Services
China
Terminals
Mumbai Pipavav
Inland Services
South Asia
Terminals
Yokohama
Terminals
Tanjung Pelepas
Terminals
Colombo
Terminals
Laem Chabang
Inland Services
Thailand
Terminals
Cai Mep
Terminals
Aarhus
Terminals
Helsinki Kotka
Terminals
Marseilles Fos
Inland Services
France
Terminals
Poti
Inland Services
Germany
Terminals
Vado Ligure
Inland Services
Netherlands
Inland Services
Romania
Inland Services
Spain
Terminals
Gothenburg
Terminals
Izmir
Terminals
Buenos Aires
Inland Services
Argentina
Inland Services
Brazil
Inland Services
Chile
Terminals
Moin
Inland Services
Ecuador
Terminals
Puerto Quetzal
Inland Services
Mexico
Terminals
Callao
Inland Services
Peru
Inland Services
Uruguay
190705-quay-crane-waiting-times-reduced

Quay crane waiting times reduced by 90% at APM Terminals Gothenburg

The implementation of new standard operational procedures for container lashing at APM Terminals Gothenburg has reduced quay crane waiting times by 90% and provides an enhanced customer experience. 

Using ‘Lean’ methodology, which is being adopted across all of the company’s terminals around the world, a Transformation Team at APM Terminals Gothenburg identified the root cause of the time delay – inaccurate information provided to the vessel crew. As a result, the team has implemented a revised process to ensure that the information sent out to each vessel call is clear, accurate and standardized. 

Vessel crews now commence unlashing in the order and sequence required to optimize the operation. The sequence is determined by a number of factors, such as container weight, optimal position in the yard or stack, and where the cargo will be loaded/offloaded next. Ensuring that the team start unlashing in the correct bay, with the right container, ensures that operators on the quay can start the discharge directly.

Delays reduced to just four minutes

As a result, quay crane waiting times have been reduced by 90 percent, from 38 minutes to just four. Completing the operation faster enables vessels to continue their onward journey much sooner, with associated cost savings.

Commenting on the initiative, APM Terminals Gothenburg Chief Operating Officer Magnus Lundberg says, “I’m proud to see our team’s strong focus on the customer as well as on operational efficiency. Our local improvement cycles are based on the Lean methodology and have brought new knowledge and developed solutions that reduce crane waiting time at the lashing startup.”

Located in the largest container port in Scandinavia, APM Terminals Gothenburg is the only terminal in Sweden capable of handling the world’s largest 19,000 twenty-foot equivalent unit (TEU) vessels.

 

Use of cookies

Apmterminals.com is using functional, analytical and tracking cookies to give you an optimal experience. Third parties and social media networks also place tracking cookies. Your online behaviour could be followed by these third parties. By pressing “accept” you accept such use of cookies.

Cookie Policy